Our patented technology

FLEXPOWER PLUS®

Proven, off-the-shelf technologies — reciprocating gas engines, waste-heat recovery (ORC), and carbon capture — combined into one system that delivers efficient, low-carbon power.

Banner image
How it works

Fully integrated system delivering reliable low-carbon power, heat and food-grade CO₂.

Nothing is wasted — FLEXPOWER PLUS® turns every unit of gas into maximum value, with the operational flexibility to direct each output to its best use.

Icon

Power

Resilient, low-carbon power delivered to data centres by private wire — up to 99.999% availability. Operates off-grid or seamlessly alongside a grid connection, and can also export surplus power.

Icon

Power

Resilient, low-carbon power delivered to data centres by private wire — up to 99.999% availability. Operates off-grid or seamlessly alongside a grid connection, and can also export surplus power.

Icon

CO₂

Captured and liquefied to food-grade quality — ready to truck to food & beverage and industrial offtakers, or move by rail or pipeline for permanent storage in the North Sea.

Icon

CO₂

Captured and liquefied to food-grade quality — ready to truck to food & beverage and industrial offtakers, or move by rail or pipeline for permanent storage in the North Sea.

Icon

Heat

Waste heat is recovered by the ORC to generate more electricity — and can also supply district heating, or co-located aquaculture and agriculture on larger projects.

Icon

Heat

Waste heat is recovered by the ORC to generate more electricity — and can also supply district heating, or co-located aquaculture and agriculture on larger projects.

Proof of Concept - Worksop Plant

The Worksop Plant is the UK’s first and only Gas with Carbon Capture plant.

Developed by Landmark Power Holdings (LMPH), and in collaboration with Rolls-Royce mtu and ASCO Carbon Capture, the plant has been fully operational since Q4 2025.

Provides flexible, resilient, baseload low-power carbon power and liquefied food-grade CO2.

Net electrical capacity is 10.5 MW.

Our mission

25 years

Expected asset life

25 years

Expected asset life

25 years

Expected asset life

Zero

Subsidies required to build

Zero

Subsidies required to build

Zero

Subsidies required to build

47%

Target electrical efficientcy

47%

Target electrical efficientcy

47%

Target electrical efficientcy

4 ton/hr

Expected CO2 production

4 ton/hr

Expected CO2 production

4 ton/hr

Expected CO2 production

Power your data centre without waiting for the grid

Get in touch to explore tailored, reliable and sustainable power solutions

CTA image
Graphic

Power your data centre without waiting for the grid

Get in touch to explore tailored, reliable and sustainable power solutions

CTA image
Graphic

Power your data centre without waiting for the grid

Get in touch to explore tailored, reliable and sustainable power solutions

CTA image
Graphic