We develop Behind the Meter low-carbon power solutions for Data Centres across the UK

With grid connections delayed until the mid 2030’s and beyond, Landmark can deliver power within 18 months of starting a project.  


We deploy resilient, modular, and efficient Gas + CCUS (Carbon Capture and Storage) power plants, using Landmark’s patented FLEXPOWER PLUS® (FPP) technology.

Projects can range from 5MW to 300MW and be scaled in phases to match demand.  They can be co-located or remotely with a Private Wire connection.  Stand alone developments, bridge to grid (and beyond) or supplementary power to existing Data Centres.

Banner image

Clean, resilient baseload power

  • Competitive power prices compared to the grid, via long term power purchase agreements (PPAs).


  • A much faster route to power than waiting for a grid connection, which can be 10+ years.


  • CO2 captured is either reused in the F&B industry or permanently stored underground

Up to 95%

of CO2 emissions captured

Up to 95%

of CO2 emissions captured

Up to 95%

of CO2 emissions captured

10-15%

Cheaper than the grid

10-15%

Cheaper than the grid

10-15%

Cheaper than the grid

18-24

months from build to first power

18-24

months from build to first power

18-24

months from build to first power

99.999%

Up to five nines power availability

99.999%

Up to five nines power availability

99.999%

Up to five nines power availability

Key Highlights

What sets Landmark apart

  • 5 to 300 MW

  • Patented FLEXPOWER PLUS®

  • 24/7 baseload power

  • Off-grid or grid-integrated

  • NOx & CO removed

  • UK's first gas + CCUS plant

  • Modular & scalable

  • 5 to 300 MW

  • Patented FLEXPOWER PLUS®

  • 24/7 baseload power

  • Off-grid or grid-integrated

  • NOx & CO removed

  • UK's first gas + CCUS plant

  • Modular & scalable

Modular & scalable

UK's first gas + CCUS plant

NOx & CO removed

Off-grid or grid-integrated

24/7 baseload power

Patented FLEXPOWER PLUS®

5 to 300 MW

Power your data centre without waiting for the grid

Get in touch to explore tailored, reliable and sustainable power solutions

CTA image
Graphic

Power your data centre without waiting for the grid

Get in touch to explore tailored, reliable and sustainable power solutions

CTA image
Graphic

Power your data centre without waiting for the grid

Get in touch to explore tailored, reliable and sustainable power solutions

CTA image
Graphic